Winning the 4 GHz Band
Two candidates dominate the discussion on populating the upper 4 GHz spectrum band: a variant of the CBRS private network system and a general-purpose, licensed mobile and stationary approach. A successful outcome would leave both the government and the private sector better off than they are today.
A spectrum auction would enable the government to gain enough money to upgrade (and potentially to relocate) incumbent systems, many of which are decades old. It would also prepare a path to 6G compatible with current EU and East Asian policy, a very desirable state of affairs for consumers, device manufacturers, and businesses.
Additional free CBRS spectrum would be beneficial for any factories that can’t get sufficient unlicensed spectrum today to run private 5G, but it would leave government networks in the same sad condition they’re in today. It’s unlikely that many such factories even exist, given the limited uptake of CBRS and the abundance of free spectrum in the 5 and 6 GHz bands.
The review of current systems in this band takes place against the background of renewed calls to reform military procurement, split responsibilities on the part of the FCC, NTIA, and Congress, as well as a pending mid-term election likely to have significant consequences. It’s important to make the decision in the broad context, one that considers the needs of both government and commerce while blazing a trail to a durable and efficient outcome.
Background
The upper 4 GHz band (4.4-4.94 GHz) is presently in use in Hong Kong, Japan, and other countries for high-performance 5G. Known by 3GPP as the n79 band, it is also a likely candidate for 6G.
The Working Families Tax Cut Act identified the band as a candidate for future commercial use, directing NTIA to study its feasibility. This directive was amplified by the President’s 6G Memorandum, stressing the competitive benefits of first-mover advantage.
The FCC is evaluating two approaches to resolving the potential conflict between current federal uses – primarily, but not exclusively, military – and future use in advanced networks. As per usual, one group of stakeholders wants to upgrade and repack the federal systems, while the other prefers freezing federal systems in their current state and making new users work around them.
In the latter construct, advanced networks would need permission from a CBRS-style overseer that only permits low-power use. This approach would be practical for private networks, while licensed use following upgrade-and-repack would permit access by the public through general-purpose cellular networks.
Spectrum Allocation Through the Ages
According to Gemini AI: “The history of U.S. spectrum allocation is defined by a shift from early government-managed radio control to market-driven commercial auctions.” This is only partially true.
The first step in US spectrum allocation was the Radio Act of 1912, which required radio transmitters to secure licenses. It was followed by the formation of the Interdepartment RadioAdvisory Committee (IRAC) 1922, which to coordinated federal government spectrum use.
The Radio Act of 1927 introduced a constraint on federal allocators, requiring them to consider “public interest, convenience, and necessity” before granting licenses by administrative fiat. The Communications Act of 1934 limited the FCC to granting commercial licenses while the Executive (ultimately NTIA) retained authority over government spectrum use. In 1993, the FCC launched its first spectrum auction, but the allocation of unlicensed (“licensed by rule”) spectrum remains under administrative fiat.
Given the amorphous nature of “public interest, convenience, and necessity” and the passage of time, the current allocation chart is a hodge-podge, allocating by frequency, power, modulation, location, propagation, angle, time, adjacency, and lobbying skill.
Command and Control
The command-and-control orientation of administrative beauty contests has created an allocation chart that is literally the stuff of comedy. Over time, every radio system becomes obsolete, but it takes administrative action to free up their spectrum for novel networks.
Every exercise in spectrum assignment by the FCC and NTIA is an opportunity to examine the existing table of allocations for redundant, obsolete, and sub-optimal historical events. The status quo in technical systems is change, not stagnation. What made sense in 1960 doesn’t always make sense today.
While both government and the private sector do better with modern, efficient, powerful systems, government (particularly, the civilian sector more than the military) lacks the incentives to innovate that animate the private sector. Competition is present for the military because adversaries never sleep, but many functions of government have an unhealthy reliance on antiquated systems.
Hence, we need to convert the contest for government-held spectrum into opportunities for enrichment, revitalization, and general improvement on the part of government. Valo Analytica, the consulting firm led by CBRS architect Andrew Clegg, argues that preserving status quo government radios is a necessary priority.
Valo’s analysis sells government short. Civil servants struggling to perform their duties with unsatisfactory tools don’t need be treated as helpless and lazy stereotypes, they need access to the funds and priorities to bring their tools up to date. Stagnation is rarely the ideal condition and it’s never the best we can do.
A successful outcome from the current spectrum assignment exercise would result in improvement for both the private sector and the government. While CBRS-style licensing enriches the private sector in a very limited way, it ignores opportunities to modernize government systems. This would be a tragic outcome as spectrum license exercises, if done correctly, can provide opportunities to improve government systems and the missions they support.
Innovation in Military Systems
The Valo argument for sharing between small, private, enterprise networks and existing government systems rests on the claims originally made in the Obama era PCAST report, Realizing the Full Potential of Government-Held Spectrum to Spur Economic Growth:
More usable spectrum, sooner. Clearing federal incumbents requires relocating mission-critical systems — historically a process taking a decade or more and costing billions of dollars, with significant friction from existing users and timelines that routinely slip. Sharing requires no such relocation: commercial deployment can begin once a coordination system is operational, and federal systems remain in place.
This sweeping claim is so familiar that it has reached gospel status, never fully substantiated with specific examples. In fact, the experience of the C-band incentive auction shows that incumbent systems can be relocated in the matter of months when their operators are incentivized. The details of relocation also show significant benefits to incumbents.
Real World Examples
The Valo report only mentions one piece of actual government equipment, the Raytheon AN/TRC-244(V)1 portable troposcatter terminal. Troposcatter is a technique used by the military since 1960 to extend the range of point-to-point radio communication by bouncing signals off the troposphere.
The AN/TRC-244 is touted by the Army as a “next generation” system that replaces the AN/TRC-170, a terminal demonstrated in September 1972 and produced a decade later. Both the 170 and 244 use 4.4–5.0 GHz C-Band frequencies known as the “DoD Troposcatter band.”
The hardwiring of these terminals to this frequency band limits their utility because the US has allies – such as Japan and Europe – that have assigned the middle C-Band to civilian systems. Recognizing this limitation, the Marines have secured a similar next generation troposcatter terminal system from Comtech/Cubic, the COMET and MTTS NGTs, operating over the 8 – 12 GHz X-Band as well as the C-Band using the supplier’s GATR inflatable satellite antenna technology.
The Comtech devices outperform Raytheon in terms of ease of setup, range, mobility, interception risk, and data rate. In this case, replacing the AN/TRC-244 with the Comtech devices is a no-brainer, resolving the apparent C-Band conflict all by itself.
Comtech coexists with modern commercial networks, while Raytheon does not. No amount of concession on the part of the FCC and NTIA can make the Raytheon device the better choice.
Consequently, we have to ask whether Valo is making a case for spectrum innovation on the part of both government and the private sector or simply protecting an inferior technology that has already been made obsolete by the Pentagon itself.
Reforming Military Procurement
The requirements for the AN/TRC-244 changed while the device was in design. The fact that the project wasn’t revised suggests a flaw in the military procurement process. This isn’t a novel state of affairs. As the American Enterprise Institute’s Mackenzie Eaglen observes:
The Pentagon bureaucracy has historically proved resistant to sustained change despite repeated reform efforts. Institutional incentives tend to favor continuity over experimentation, reinforcing a risk-averse culture that limits rapid innovation, agility, and adaptation. Combined with political challenges across Washington, this has often stifled well-meaning efforts at defense reform.
While the Marines realized that troposcatter terminals need to be deployable internationally, the Army chose to continue with a 65-year-old spectrum assignment only useful in the United States. The mindset that produced such a blunder doesn’t need to be protected from national and international market realities. In fact, the very effort to do so is bizarre.
A deliberate process of review comparing each existing type of 4 GHz government equipment to national and international realities in 2026 and beyond would probably yield quite an inventory of substandard gear. Relocation funding from the auction of this band will close the circle by bringing upgrades to fruition.
Upgrade-and-repack can take place just as rapidly as CBRS workaround. It took the better part of a decade for the original CBRS to come to the market in the first place, and it’s not even done yet.
Conclusion
We can’t allow the dysfunctional Pentagon procurement process to compromise the U. S. economy. This is exactly the outcome we should expect if we shackle the 4 GHz band with the low power demanded by the CBRS approach to permission.
We’ve already made an abundance of low-power, unlicensed spectrum available to innovators. As the use case for this spectrum is local area networks, it can be reassigned every few hundred feet. Factories and campuses can deploy in unlicensed band with little to fear in the way of interference.
Rather than freezing government systems in their present state, we should employ the best tools we have – both financial and technical – to make sweeping, across-the-board improvements. The best way to do this is to auction 4 GHz spectrum licenses and use a significant part of the proceeds to upgrade antiquated systems. This approach will also facilitate the transition to the next generation of cellular, making it the only win-win outcome.
